The VoIP Lounge 12 Foot Flat Black Phone Handset Receiver Curly Cord with Long Lead (Please Read The Full Description)

Amazon.com Price: $7.99 (as of 23/07/2021 11:36 PST- Details) & FREE Shipping.

Make sure this fits by entering your model 12 Feet Fully Stretched, 22 Inches Coiled (See Full Description Below) Flat Black Color Brand New – Individually Bagged Please read the description regarding Telecom Industry Standard Cord Lengths

Compare

Description

Brand New, The VoIP Lounge, 12 foot flat black universal handset cord. This can be a flat black cord that may be 12 feet long when it is fully extended to its maximum length, and is about 22 inches in its coiled, unstretched state. Handset cords are rarely used at their maximum length, and most generally usable anywhere from 35% to 75% of their advertised length, depending on how much you need to stretch them. Once stretched to the maximum length, cords do not retain their original shape or quality, so it will be significant to select wisely when buying. The advertised size of the full maximum extended length is a Telecom Industry Standard, and not something that may be made up our minds by us, or any other manufacturer or seller. Cords & Lengths: To be had lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched) *Bulk orders will be packaged in a number of 10 every.

Make sure this fits by entering your model number.
12 Feet Fully Stretched, 22 Inches Coiled (See Full Description Below)
Flat Black Color
Brand New – Individually Bagged
Please read the description regarding Telecom Industry Standard Cord Lengths

Additional information

Package Dimensions

Item Weight

Item model number

Is Discontinued By Manufacturer

Date First Available

Manufacturer

Brand